Guidance

Construction of Soundproofing Barriers

Since Taipei metro began operation, the surrounding environment and infrastructure along its tracks have changed greatly. With its management philosophy of "Customers Come First and Quality Above All" and its mission of "Providing a Safe, Reliable, Cordial and High-Quality Transportation Service" to travelers, Taipei Metro has taken the initiative in the construction soundproofing barriers to improve the quality of life of the residents living along the ground level tracks (Tamsui Line) and the elevated tracks (Tamsui and Wenshan-Neihu lines). Other measures, such as lubrication of wheel flange, wheel turning, rail surface leveling, base plates renewing, installment of new-style switches, and even adjusting our operational mode if circumstances require, have also been implemented to further reduce the operational noise impact on neighboring communities. Soundproofing barriers along the Xinbeitou Branch Line and the elevated track between Beitou and Fuxinggang stations.
Soundproofing barriers along the Xinbeitou Branch Line and the elevated track between Beitou and Fuxinggang stations.

(1)Tamsui Line:

Results and progress of this construction are charted below:
Span
Completed
Length
(in meters)
Results
Surfacing track section
1Minquan W. Rd. surfacing track area2001.10162Metro event volume decrease: 11~15 A-weighted decibels.
The elevated track sections
2The Xinbeitou Branch Line2006.072,067Maximum Metro event volume decrease: 10~15 A-weighted decibels.
3Between Beitou and Fuxinggang stations2006.111,698Maximum Metro event volume decrease: 10~12 A-weighted decibels.
4Between Minquan W. Rd. and Jiantan stations2007.011,609Maximum Metro event volume decrease: 8~12 A-weighted decibels.
5Between Shilin and Zhishan stations2007.08900Maximum Metro event volume decrease: 8~12 A-weighted decibels.
6Between Gongguan Rd. and Qiyan Station (up track side) and between Qiyan and Beitou stations2009.111,932Maximum Metro event volume decrease: 7~12 A-weighted decibels.
7Between Shipai and Qilian stations (up track side) and between Qilian Station and Gongguan Rd.2009.122,101Maximum Metro event volume decrease: 7~14 A-weighted decibels.
8Between Shipai and Qilian stations (down track side) and both sides of Qilian Station2010.031,737Maximum Metro event volume decrease: 7~16 A-weighted decibels.
9 Between Shilin and Jiantan stations2010.091,289Maximum Metro event volume decrease: 6~10 A-weighted decibels.
10Both sides of Zhishan Station and nearby area2010.091,332Maximum Metro event volume decrease: 6~10 A-weighted decibels.
11The stretch between Qilian Station (Parking Area) and Qiyan Station2013.021,737Maximum Metro event volume decrease:7~16 A-weighed decibels.
12The stretch between Qiyan and Beitou stations2013.02773Maximum Metro event volume decrease:6.9~8.5 A-weighed decibels.
13The areas on both sides of Jiantan Station2013.02534Maximum Metro event volume decrease:6~7.6A-weighed decibels.
14The stretch between Zhishan (from Dexing W. Rd)and Shipai station2013.032,642Maximum Metro event volume decrease:9~12 A-weighed decibels.
15The areas on both sides of Shilin Station2013.031,079Maximum Metro event volume decrease:11~13 A-weighed decibels.
16The stretch between Zhishan and Shipai Stations2014.03895Maximum Metro event volume decrease: 6~10 A-weighed decibels.
The ground level track sections
17Between Beitou and Fuxinggang stations2003.06744Maximum Metro event volume decrease: 11~17 A-weighted decibels.
18Between Zhuwei and Tamsui stations2005.06800Maximum Metro event volume decrease: 9~12 A-weighted decibels.
19Between Fuxinggang and Zhongyi stations and the nearby area adjacent to the Guandu Station 2006.071,500Maximum Metro event volume decrease: 10~16 A-weighted decibels.
20The area running along Sec. 2, Fengnian Rd. between Beitou and Fuxinggang stations2013.02260Maximum Metro event volume decrease:15.9~16.8 A-weighed decibels.
21The stretch between Guandu and Zhuwei stations (up track side)2013.02384Maximum Metro event volume decrease:8 A-weighed decibels.
22The stretch between Zhongyi and Guandu stations (down track side)2014.03726Maximum Metro event volume decrease: 11~20 A-weighed decibels.
23The stretch between Guandu and Zhuwei stations (down track side)2014.08187Maximum Metro event volume decrease: 8 A-weighed decibels.

(2)Wenshan-Neihu Line:

Results and progress of this construction are charted below:
Span
Completed
Length
(in meters)
Results
1Between Linguang and Xinhai stations2006.08740Maximum Metro event volume decrease: 8~12 A-weighted decibels.
2Between Zhongshan Junior High School and Nanjing Fuxing stations2010.07520Maximum Metro event volume decrease: 8~12 A-weighted decibels.
3Between Linguang and Liuzhangli stations2010.071,502Maximum Metro event volume decrease: 4~16 A-weighted decibels.
4Between Wanfang Community and Muzha stations2010.07200Maximum Metro event volume decrease: 11~15 A-weighted decibels.
5Between Muzha and Taipei Zoo stations2010.07150Maximum Metro event volume decrease: 12~20 A-weighted decibels.
6Between Zhongshan Junior High School and Nanjing Fuxing stations2010.08608Maximum Metro event volume decrease: 4.1A-weighted decibels.
7Between Daan and Technology Building stations2010.08290Maximum Metro event volume decrease: 4.3 A-weighted decibels.
8Between Linguang and Xinhai stations2010.08210Maximum Metro event volume decrease: 4.2~9.4 A-weighted decibels.
9Between Wanfang Community and Wanfang Hospital stations2010.08243Maximum Metro event volume decrease: 4.8 A-weighted decibels.
10Between Wanfang Community and Muzha stations2010.08345Maximum Metro event volume decrease: 4.8 A-weighted decibels.
11The stretch between Zhongshan Junior High School and Songshan Airport stations2012.08528Maximum Metro event volume decrease: 6 A-weighed decibels.
12The stretch between Zhongshan Junior High School and Liuzhangli stations2013.027,818Maximum Metro event volume decrease:6.1-10.6A-weighed decibels.
13The stretch between Xinhai and Wanfang Hospital stations2013.02660Maximum Metro event volume decrease:7.9 A-weighed decibels.
14The stretch Between Wanfang Hospital and Wanfang Community stations2013.02238Maximum Metro event volume decrease:6 A-weighed decibels.
15The stretch between Wanfang Community and Muzha stations2013.02122Maximum Metro event volume decrease:6 A-weighed decibels.
16The stretch between Zhongshan Junior High School and Songshan Airport stations (up track side)2013.03237Maximum Metro event volume decrease: 6 A-weighed decibels.
Soundproofing barriers between Minquan W. Rd. surfacing track area and Yuanshan station.
Soundproofing barriers between Minquan W. Rd. surfacing track area and Yuanshan station.
Soundproofing barriers along the elevated track between Jiantan and Shilin stations.
Soundproofing barriers along the elevated track between Jiantan and Shilin stations.
Soundproofing barriers along the elevated track between Mingde and Shipai stations.
Soundproofing barriers along the elevated track between Mingde and Shipai stations.
Soundproofing barriers along the elevated track between Qiyan and Beitou stations.
Soundproofing barriers along the elevated track between Qiyan and Beitou stations.
Soundproofing barriers along the ground level track between Beitou and Fuxinggang stations.
Soundproofing barriers along the ground level track between Beitou and Fuxinggang stations.
Soundproofing barriers along the ground level track between Guandu and Zhuwei stations.
Soundproofing barriers along the ground level track between Guandu and Zhuwei stations.
Soundproofing barriers along the elevated track between Linguang and Xinhai stations.
Soundproofing barriers along the elevated track between Linguang and Xinhai stations.
Soundproofing barriers along the elevated track between Liuzhangli and Linguang stations.
Soundproofing barriers along the elevated track between Liuzhangli and Linguang stations.
Soundproofing barriers along the elevated track between Zhongshan Junior High School and Songshan Airport stations.
Soundproofing barriers along the elevated track between Zhongshan Junior High School and Songshan Airport stations.

  • Hit: 8598
  • Updated: 2015/10/19 15:15
  • Reviewed: 2015/10/19 15:15

  • Source: Taipei Rapid Transit Corporation